top of page

Click on the image to see the details of the project.

EXHIBITION done by govind sharma

Goal: To design a low cost, reusable and easily deployable exhibition layout.

Position: Design Co-lead + Prototyping Lead

Work Involved:

1. Scaled down soft modelling.
2. Ideating, brain storming & concept freezing.
3. 3D modelling and rendering
4. Communication panel interface design.
5. Deployment of the design at Bombay Exhibition Centre.

REFRESH | Refrigerator | Godej

Goal: To design an efficient refrigerator with ten

new USP incorporated.

Position: Design Co-lead + Prototyping Lead

Work Involved:

1. Primary research and paper study.
2. Ideating, brain storming and concept freezing.
3. Concept testing, evaluation & implementation in design.

4. Engineering design and 3D modelling.
5. Prototyping of 1:1 scaled working refrigerator.
6. Quantitative and qualitative evaluation of the prototype.

Govind Sharma Designs

Goal: To explore, evaluate, design and implement the new ergonomic cabin for Material handling equipment. 

Position: Design co-Lead + Prototyping co-Lead

Work Involved:

1. Primary & secondary research and visits to workplaces.
2. Ideating, brain storming and concept freezing.
3. Exploring and evaluating various ergonomic dimensions.
4. CAD modelling for mass production.
5. Implementing the changes in current cabin.

Skutro Godrej | Govind Sharma | Design

For more, Please visit

www.skutro.com

Goal: To design a man powered cart for narrow aisles warehouse having close U-turn.

Position: Design Lead + Prototyping Lead

Work Involved:

1. Secondary research and visits to warehouse.
2. Ideating, brain storming and concept freezing.
3. Aesthetics, Design and 3D modelling for mass production.
4. Providing CMF details for the cart and development.
5. Launching the product with the given timeline.

Work Involved:

1. Primary & secondary research and interacting with machine.
2. Ideating, brain storming and concept freezing.
3. Exploring and evaluating various possibilities.
4. CAD modelling for mass production.
5. Implementing the changes in current design.

Position: Design Lead + Prototyping Lead

Goal: To explore, evaluate, design and implement the new  fascia for oats vending machine.

OATS | Govind Sharma | Designs
bottom of page